STATUS OF INFRASTRUCTURE IN JNV’S
I |
Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
|
: 30.00 Acres
: Yes
: Yes |
|
||
ii |
Status of Boundary Wall
a. Brick Wall b. Barbed wire fencing
|
: Completed
Completed ---
|
|
||
iii |
Permanent buildings constructed
|
CPWD pattern |
|
||
iv |
School building
|
: Complete |
|
||
v |
Dormitories |
: Boys 02 Nos. with Warden Residence 08 Nos.
|
|
||
: Girls 01 Nos. with Warden Residence 04 Nos.
|
|
||||
vi |
Kitchen/dining Hall
No. of shifts required for all students to take food
|
: Complete
: 02 |
|
||
vii |
Principal Residence
|
: 01 No. |
|
||
viii |
Staff Quarters
|
: Type III = 16 Nos. Type II = 06 Nos. Type I = 06 Nos. SP Sheds converted into Staff Qrs.: -- Nos. |
|
||
ix |
M.P. Hall
|
Not available |
|||
x |
Workshop
|
Not available |
|||
xi |
Type of O.H. Tank
Its capacity
Present Status
|
: Shaft type / Column based
: 100000 litres
: Working satisfactory |
|||
xii |
U.G. tank Its capacity
Present Status
|
: 100000 litres
: Working satisfactory
|
|||
xiii |
D.G. Set
|
: Available : Kirloskar make : 10 KV : Not working : Year of procurement - 1999
|
|||
xiv |
Sewage Pump
|
: 7.5 H.P. |
|||
xv |
Water Pump
|
: 7.5 H.P. capacity |
|||
xvi |
Electrification
Electric connection Sub Station building Street lighting
Numbers of hrs. during day when power supply is available on an average.
|
: Urban Feeder : Complete : 70 Nos. of Poles
: 24 hrs.
|
|||
xvii |
Playfields
400 metre track 40 x 30 metre basket ball court 40 x 30 metre volley ball court
|
: Available : 02 Nos. – Available : 03 Nos. – Available
|
|||
xviii |
Water supply Tube Well Hand pump Connection from PHED
|
: Potable, 01 Nos.- working : Potable, 05 Nos.- working : NA hours supply in a day |
|||
xix |
Rajiv Gandhi Smriti Van
|
: Available |
|||
xx |
Fire fighting arrangement
|
: Working |
|||
xxi |
Last date of cleaning of
|
: 20.06.2015 : 27.06.2015 |
|||
xxii |
Whether area around transformer is fenced |
: No |
|||
xxiii |
Whether open wells, if any, are covered from top |
: No open wells in campus |
|||
xxiv |
Works taken up under M&R fund during current year and last year:-
|
: |
|||
Year |
Name of work (M&R) |
Expenditure (Rs. In lacs) |
Cumulative expenditure during the year |
||
2014-15 |
Const. of Ramps & Toilets |
4.30 lacs |
4.15 lacs |
|
Details of vehicle provided to the Vidyalaya
|
||
(i) |
Whether vehicle is provided or not (Yes/No)
|
No |
|
(ii) |
Description to vehicle.
|
NA |
|
(iii) |
Model no and date of purchase.
|
NA |
|
(iv) |
Present condition of the Vehicle.
|
NA |